Passer au contenu principal

Falco Solar

Skip to article content

Falco Solar featured in Le Journal des Entreprises

A look back at Le Journal des Entreprises’ coverage of Falco Solar and the industrial solar tracker project at Monswiller in France.

Reading time: about 1 minUpdated on
Falco Solar photovoltaic tracking system.

Le Journal des Entreprises published a report on Falco Solar and R&D Technology’s Monswiller project on 14 November 2025. This English summary keeps the reported plans and expectations separate from verified operating results.

An industrial application for solar tracking

The report described three trackers with a reported installed capacity of 14 kWp and a planned commissioning. It placed the project within Falco’s approach to solar generation for on-site consumption.

Available ground around industrial buildings can be worth examining where movement, foundations and service access fit the site.

Expectations are not measured results

The press report cited a five-year return expected by the customer. That expectation is specific to the report and its date; it is not a guaranteed payback or a measured result. The detailed project article uses a different estimate, so the figures should not be merged into a single verified outcome.

For a new project, obtain the underlying assumptions and distinguish forecast savings from recorded operation.

Development objectives in their historical context

The French article also reported Falco’s ambition to reach 1.5–2 MWp installed in 2026. It described a target announced at the time, not a verified completed installation total.

The SunPro project account and comparison guide provide a more useful basis for preparing a site-specific assessment.

Share this article

LinkedInFacebook

Your solar project starts here

Tell us about your site and electricity needs.

Discuss your project